Awasome State Road And Tollway Authority Ideas. This toll road will connect lampung and aceh through 24 different roads with a total length of 2,704 km and will be fully operational in 2024. Srta also provides grants and.

Srta also provides grants and. This toll road will connect lampung and aceh through 24 different roads with a total length of 2,704 km and will be fully operational in 2024.